01757 212085 info@abscaffselby.com

Sentinel towers block A

We was asked to provide scaffolding to student accommodation with very little impact on the day to day use of the building and facilities. With that in mind we saw that a general use independent was not practically and a designed scaffold was sought to keep parking bays accessible and material storage to a minimum as over 300 tonne of stock would be needed. We reduced that by approximately 120 tonne using the methodology seen. We wasted no materials on unwanted areas, providing access to only desired areas doing so saving logistics time and meeting program which was near impossible. We completed this 58m round x 24m high scaffold in just 17 days

Discuss your project with us

ABscaff are dedicated to providing unparralled levels of customer service, safety and overall quality. Send us a message to discuss your project.